Clear the play area before the crew arrives, but leave heavy framing in place. The useful preparation is information: dimensions, materials, anchor points and the path to the loading area.

Before the estimate

  • Photograph all four sides and the ground at each post.
  • Measure the overall footprint and tallest point.
  • List slides, swings, climbing walls, roofs and loose accessories.
  • Show the narrowest gate and any stairs.
  • Point out lighting, power or other installed features.

Before the work date

  • Remove toys and personal items from the surrounding yard.
  • Keep children and pets away from the work zone.
  • Move fragile planters, furniture and decorations off the carry route.
  • Confirm where reusable accessories should be placed.
  • Arrange parking or gate access for the agreed arrival window.

Anchors change the job

Some playsets rest on the surface. Others use buried stakes or posts set in concrete. A photo at each leg helps identify what is visible, but hidden conditions may only become clear during dismantling. Decide in advance whether below-grade anchors should be removed, cut back or left for a later contractor.

Need help with playset removal?

Review the working scope, then call with photos and access details.

See Playset Removal